Competition 2008: Primary school with sports centre, Esch-Nonnewisen, 2.prize

Our design accommodates the two main elements of the project – the school and the sports centre – in two separate buildings, with a sheltered playground created between them. The playground is accessible via a roofed connecting walkway running along its street side. The line of the single building plinth defines the entire complex. In order to reinforce the relationship between the individual units that make up the complex, both buildings have the same parapet height and are to be constructed in the same architectural concrete material.